Machinery Shipping & Export

From machine confirmation to loading and export documents, LIHIGH helps international buyers move construction machinery from China to the destination port.

Construction machinery prepared for international shipping

Choose the Method for the Actual Machine

Shipping depends on overall dimensions, weight, destination port and local import requirements. We compare practical options after the exact machine is selected.

ContainerCost-efficient for machines that can be safely prepared within container dimensions.
Flat RackSuitable for oversized machinery requiring open loading and secure lashing.
RoRo / BulkUseful for complete large machines and multi-unit shipments on available routes.

From China Yard to Destination Port

01EX

Confirm the Machine

Actual photos, serial plate, condition details and working video are confirmed before shipment.

02EX

Inspection & Preparation

Engine, hydraulics, structure and undercarriage are checked. Removable parts can be prepared for loading.

03EX

Loading Arrangement

Container, flat rack, RoRo or bulk vessel is selected according to machine size and destination.

04EX

Documents & Shipment

Loading records, commercial documents and shipment information are prepared for the buyer.

Clear Information for Your Order

Document requirements vary by transaction and destination. The quotation clearly states the offered trade term and included support.

  • Commercial invoice and packing information
  • Machine identification and loading photos
  • Bill of lading coordination with the shipping agent
  • Export declaration support according to the order
  • FOB or CIF quotation with destination details

Send the Machine Model and Destination Port

Request Shipping Quote
Q